Westfield Kotara

Year:2016
Construction Value:$350 million
Owner:Scentre Group
Builder:Probuild Constructions
Scope:Scope: Supplied 1703 metres of movement joint systems including seismic & Fire barrier seals. 1900 metres of tile control joints also supplied.
Products:Aquo P; By N Aq H; Fx D; Fx CH /Fx CHT; Fx CS; Fx CST; Si T; Vt P; Dz MF; Py I

Expansion Joints supplied:

562 metres Car park Expansion Joint cover plate and water proof seal

119 metres Heavy duty aluminium bespoke floor expansion system.

147 metres Floor movement joint with stainless steel cover plate.

77 metres Seismic floor and wall Expansion Joints.

136 metres Floor movement joint with stainless steel cover plate

662 metres Fire seals and fire blanket expansion gap barrier

1900 metres Neoprene control joint for tiles