
Mackay Base Hospital QLD
Year: | 2017 |
---|---|
Engineer: | Woods Bagot, Sanders Turner Ellick Architects |
Scope: | Manufactured and installed 1,531 metres of cover plates, fire seals, watertight seals, and hospital-grade thermoplastic seals for the $405M redevelopment. |
Products: | Fx CS; Py I; Py B; Aquo P; Vt P; Si DX; Vt S |
Fire resistant joint seal & Fire blanket AS1530.4. AS4072.1 & BS476.2 certified and tested