Mater Hospital Springfield
| Year: | 2025 |
|---|---|
| Builder: | JHG with Peddle Thorp & Aurecon |
| Project: | $393 million extension - Stage 2 of the redevelopment |
| Scope: | 803 metres of Seismic expansion floor & wall system, waterproof gland and fire rated barrier strips. Cover plate -beaded blasted to P5 slip resistance. Wheelchair certified. |
| Products: | Si DX; Py I; Fx CH /Fx CHT; Aquo H; Py B; Vt C; Vt P |