Grand Central Shopping Centre

Year:2025
Builder:Northbuild Constructions with Buchan Group Architects
Products:By NS Aq P; Acc G NF; Fx D; Py I; Aquo P

Scope: Commenced in 2023, supplying a mechanical, DDA-compliant, and waterproof expansion joint system for the rooftop car park refurbishment, with work continuing into 2025. A total of 951 metres has been supplied, including fire-rated seals. During the 2017 refurbishment, 630 metres of our intumescent fire strip were installed.

icon-loading-light-vehicle icon-loading-heavy-vehicle icon-applications-carpark   certified-disability-accessible   niconc-p4-slip-resistance  niconc-hundred-percent-australian-owned-and-operated