Frankston Hospital Redevelopment

Year:2024
Project:$1.1 Billion Redevelopment
Scope:Supplied 110 metres of Vertical Wall Joint Covers. The Vt S system features extruded aluminium retainers paired with a durable thermoplastic cover, available in a range of colour options.
Products:Vt S